- Define a procedure to achieve consistency in all machine and rail setups during initial building steps
- All ESAB Gantry Type Cutting machines with square rails.
- Machine Squaring Procedure
- Machine Installation Drawings
- Set up and level the rails to the correct dimension.
- This should include rail gauge, straightness, level, etc. per our published installation drawings.
- When leveling the rail, use the line level (six-inch precision) to ensure the roll on the rail is zero (rail is level side to side).
- Set wheels and axles in trucks to center of wheel opening.
- Assemble the side bearings on both sides of both trucks.
- Set "X" and "W" axis trucks on rails.
- Set beam in place and bolt down.
- Set deck in place but do not bolt down.
- Adjust the guide eccentric bearings on rails using .003 shim.
- Set the rail gauge using the X-fixed guide bearing centerline to the W-eccentric guide bearing centerline to within 1/64". (Front & Rear)
- Perform preliminary squaring by drawing Four Corners.
- Square the Y-axis rails to the X-rail within 1/64" across the entire width of the beam. This can be interpolated using trigonometry and the measurements of the diagonals from the largest possible square drawing.
- Level the Y-axis rail.
- Install Dial Indicators to monitor "W" truck (use the cover bolts to secure the indicators and dial in zero on indicators).
- Remove the extra fixed bearings on the "W" truck.
- Adjust the deck as close as possible to the beam.
- Never force the deck in place. If bolts do not line up then re-drill holes in deck to match.
- Insert bolts to secure deck but do not tighten.
- Shim the distance between deck and beam.
- Tighten bolts using shims so beam does not move.
- Bolt deck to the trucks. If bolts do not line up then re-drill holes in deck to match.